Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Boussabaine, A H and Elhag, T M S (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(06), 745-55.

Brooker, P (1999) Survey of construction lawyers' attitudes and practicein the use of ADR in contractors' disputes. Construction Management and Economics, 17(06), 757-65.

Bubshait, A A, Farooq, G, Jannadi, M O and Assaf, S A (1999) Quality practices in design organizations. Construction Management and Economics, 17(06), 799-809.

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(06), 711-20.

Fraser, C (1999) A non-results-based effectiveness index for construction site managers. Construction Management and Economics, 17(06), 789-98.

  • Type: Journal Article
  • Keywords: competence; effectiveness; index; site manager; stakeholder
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461999371123
  • Abstract:

    A method is presented for non-results-based effectiveness indexing of construction site managers (CSMs). The 52 competence element index is based on previous research on construction-specific competency elements and stakeholder assessment systems. The method was qualitatively assessed through industry focus groups and quantitatively validated through an empirical study. The performance of 61 Australian CSMs was evaluated by 329 peers, superiors and subordinates. The measurement tool successfully measured each individual’ s level of ability on each competence element and produced an individual effectiveness score for each CSM. The application of the method resulted in the identification of three levels of effectiveness: a distinct and homogeneous `elite’ group of very effective CSMs; a very low performing control group of former CSMs; and a group of CSMs that are adequately effective. The development and validation of the method are provided, plus some insights into the characteristics of each of the groups identified.

Hanna, A S, Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(06), 721-30.

Leu, S-S and Yang, C-H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(06), 767-76.

Loosemore, M (1999) Responsibility, power and construction conflict. Construction Management and Economics, 17(06), 699-709.

Roy, R and Cochrane, S P (1999) Development of a customer focused strategy in speculative house building. Construction Management and Economics, 17(06), 777-87.

Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(06), 731-43.